|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
P1: Nitrous at Balls in '08Hybrid GSE PlumbingLast Update, 8/21/07 by Stephen Daniel |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Project SummaryWe decided to build the plumbing stack that takes nitrous from a commercial nitrous cylinder out to the motor. We believe we can build a higher quality stack for somewhat less money. The design is straightforward. Nitrous goes through a T-connector that provides a pressure guage for the inlet pressure. The flow then goes through a solenoid control valve, and then another T-connector. This connector hooks in the line purge valve. The T-connector if plumbed out to a fitting that matches our AN-4 hose fittings. An AN-4 to 1/4" NPT fitting for the end of the host completes the stack. Existing high-pressure nylon tubing will take the nitrous to the rocket's quick-disconnect fitting. The main solenoid valve is Pratt Hobbies "BFV Solenoid Valve". The line-purge valve is a Predyne valve. This page contains information on the design of the plumbing that provides nitrous to the motor. Our current plumbing parts list follows. All part numbers are McMaster-Carr.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||